Connect with us

News

NNPCL Staff Falls Off From 5-storey Building, Dies

Published

on

A contract employee with the Nigerian National Petroleum Company Limited (NNPCL), identified as Asher Christopher, tragically died on Tuesday after reportedly falling from a five-storey building while on duty.

The 23-year-old was working at the time of the incident. However, the exact details surrounding his death remain unclear. Christopher’s family is now calling for a comprehensive investigation into the circumstances leading to his fall.

Christopher’s father, Christopher Dan, expressed his distress over the lack of information and access to his son’s body.

Dan recounted being informed by one of his sons about the incident around 4:15 p.m. on Tuesday.

Advertisement

His words : “On Tuesday about 4:15 p.m., one of my sons called me that a colleague of Asher Christopher called him that I should come to Old GRA Police that the Police needed me, so I asked what happened, my son said he doesn’t know.

“When I got there, I asked where is Asher, they searched, they did not see my son’s name on the list at the Police station. I had to ask my son to call Asher’s colleague again, he now called the person, if it was old GRA Police station or not.

“The person said I should come to the Surveillance Office, upstairs at Old GRA Police station. I waited that Tuesday till 7p.m., one of the Policewomen told me to come back on Wednesday. On Wednesday, the Police took I and my wife with other people to the company, NNPC Upstream and Down Stream, at Moscow Road.

“So, I asked them to show me where the boy fell from. They said nobody really know if he fell from the 2, 3 4, 5, 6, 7 or the last floor.

Advertisement

“I asked them how the boy look like, they said he is with empty body. So, I asked them to show me the place. They went to show me the place. I have pictures of the place they claim he fell. I looked at the place, there is no sign that somebody fell from there.”

Grace Iringe-Koko, the Public Relations Officer of the state police command, confirmed the incident and stated that an investigation is underway at the Old GRA Police Division.

Additionally, Mr. Prince Wiro, National Coordinator of the Centre for Basic Rights Protection and Accountability Campaign, has called for a thorough probe into the incident. Wiro questioned why the matter was not reported to the Central Police Station (CPS), which handles the jurisdiction where the incident occurred.

Advertisement
Continue Reading
Advertisement
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

News

FULL STEPS: How to check 2025 JAMB results

Published

on

By

The Joint Admissions and Matriculation Board (JAMB) has officially released the results of the 2025 Unified Tertiary Matriculation Examination.

The examination board in a statement said more than 75 percent of candidates who sat for the 2025 Unified Tertiary Matriculation Examination (UTME) scored below 200, according to official data released by the Joint Admissions and Matriculation Board (JAMB) on Monday.

Here is how to check JAMB 2025 results using SMS

Option 1

Advertisement

To check the 2024 Unified Tertiary Matriculation Examination (UTME) result, all you need to do is send UTMERESULT to 55019 or 66019 using the same phone number that he/she had used for registration.

After sending the SMS, the result would be returned as a text message.

This is the only process of checking the 2024 UTME results for now.

The following are the responses you should expect:

Advertisement

*If a candidate uses a phone number that was not used to register, a message will be sent to him thus: ‘This phone number was not used for registration.”

* A candidate with a result will receive the message: “Dear Mr/Miss X, your result is as follows… (And the details will be provided).

* If a result is withheld, a “Result Withheld” message will be sent to the candidate.

* If a candidate belongs to the category being given the benefit of the doubt, the message to the person will be: “Result withheld pending the upload of clarifications/documents required from you.”

Advertisement

* If a candidate was absent, he or she would get “CANDIDATE ABSENT” as feedback

* A candidate who was ABSENT WITH REGISTRATION NUMBER also CANCELLED will be so informed.

* “Invalid Entrance into the Exam Hall” will be sent to a candidate who gained unauthorised access to the examination hall.”

Option 2:

Advertisement

Check Your UTME Result Online

Visit the JAMB eFacility Portal:

Go to https://efacility.jamb.gov.ng/login using a web browser.

Log In:

Advertisement

Enter the email address and password you used during UTME registration.

Access Your Result:

Once logged in, click on the “Check UTME Results” tab. Your scores for each subject will be displayed on your dashboard.

Advertisement
Continue Reading

News

Ministry denies awarding N13bn contracts without due process

Published

on

By

The Federal Ministry of Finance has dismissed allegations that it awarded contracts worth N13 billion between February and June 2024 without following due process.

In a statement issued in Abuja on Monday, the Ministry firmly refuted the claims, stating that at no point were any contracts awarded outside the bounds of established legal and regulatory procedures.

The reports had alleged that Minister of Finance and Coordinating Minister of the Economy, Mr. Wale Edun, and the Permanent Secretary, Mrs. Lydia Shehu Jafiya, were involved in irregular contract dealings.

However, the Ministry described the accusations as entirely baseless and misleading.

Advertisement

It clarified that all contracts awarded during the period, including those under the Presidential Initiative on Compressed Natural Gas (Pi-CNG), were in full compliance with the Public Procurement Act and other relevant laws.

“The publication in question is not only unfounded but also malicious,” the Ministry said. “It is aimed at tarnishing the reputation of the Minister and the Permanent Secretary, as well as disrupting the critical initiatives currently underway to revamp the economy under the Renewed Hope Agenda of President Bola Ahmed Tinubu’s administration.”

The Ministry stressed that transparency and accountability remain at the core of its operations. It pointed to the ongoing efforts in managing the national economy efficiently as evidence of this commitment.

While acknowledging the essential role of the media in promoting good governance, the Ministry cautioned media organisations to verify their information before publishing. “We will not hesitate to take legal action against any individual or organisation that seeks to damage the Ministry’s reputation through false and malicious publications,” it warned.

Advertisement

It further urged members of the public to disregard the report, reassuring Nigerians of its dedication to advancing economic reforms that will positively impact their lives.

“The Ministry is working diligently to implement the President’s economic vision. Nigerians can rest assured that every decision taken is in their best interest,” the statement concluded.

Continue Reading

News

Court halts Abuja multi-million naira market project

Published

on

By

A High Court of the Federal Capital Territory (FCT) has issued an order stopping further development works on the planned multi-million Abuja market project known as the Apo Resettlement Market Scheme.

Justice Yusuf Halilu, in a ruling, ordered the AMAC Investment and Property Development Company Limited, Commercial Properties Ltd, Manillah Integrated Partners Ltd and their agents to halt any further works on the market project located at plot 1729 Cadastral Zone E27, Apo, Abuja.

The interlocutory injunction, Justice Halilu said, is to subsist until the determination of a suit brought against Dr. Shuaibu Omeiza Musari and his company, Techs and Concretes Nigeria Ltd, by AMAC Investment, Commercial Properties and Manillah Integrated.

The ruling delivered on April 15 was on the application filed by Techs and Concretes Nigeria Ltd, with which it sought to preserve the subject of the dispute between parties in the suit, marked: CV/467/2024.

Advertisement

Techs and Concretes Nigeria Ltd stated in a supporting affidavit that a dispute arose between parties when Manillah Integrated Partners allegedly decided to breach an agreement between them to jointly develop the market.

It stated that by the joint venture agreement executed between them, Manillah Integrated Partners was designated as the “developer” while Techs and Concretes Nigeria Ltd was designated as the “financier, co-developer and sole marketer.”

Techs and Concretes stated that contrary to the terms of the agreement between them, Manillah Integrated Partners allegedly went behind to unilaterally commence the development of the market project.

It stated that the suit by Manillah Integrated Partners and others was intended to shield them from being made to comply with the agreement, with the intention of getting away with their breach of the agreement.

Advertisement

In the ruling of April 15, Justice Halilu said: “From what has played out, as contained in the respective affidavits for and against the application for interlocutory injunction, I am fortified to say that there is indeed an agreement which both parties have signed, is the document at the centre of the misunderstanding.

“The second defendant/applicant (Techs and Concretes Ltd) is entitled, in law, to rely on same (the agreement) as the basis for establishing legal interest and has indeed established same as a matter of right, which deserves legal protections.

“I am minded to hold that the balance of convenience hinges heavily in favour of the applicant (Techs and Concretes).

“On the whole, therefore, I have no difficulty granting the application in the overriding interest of justice and fairplay,” the judge said.

Advertisement

On Monday, Dr. Musari, accompanied by some officials of his firm and security personnel, visited the project site to paste the court order and notify workers on the site to cease operations as ordered by the court.

Dr. Musari said as a law-abiding citizen he was not interested in any trouble, but that the right thing should be done, with parties complying with the order of court and waiting for the final determination of the case.

Continue Reading

Trending

Copyright © 2024 Naija Blitz News