Video/Photos: Light up Abuja becomes reality as FCT minister Wike flags off integrated (Hybrid) lighting project

…to be completed in six months

ADVERTISEMENT
Zoom Ad
ADVERTISEMENT
Zoom Ad

Finally, Light Up Abuja has become a reality as Federal Capital Territory, FCT minister Nyesom Wike flagged off the project today 2nd of October, 2025 at the installation of Integrated (Hybrid) Solar Lighting in the Districts of Abuja City and Expressways under the LIGHT UP ABUJA PROJECT: LOTS I & II.

Lot 1 will take care of Maitama, Central Area, Wuse, Asokoro and Airport Expressway while Lot 2 is comprised of Katampe, Katampe Extension, Jabi, Garki, Gudu, Mabushi.

Advertisement

The LIGHT UP ABUJA PROJECT includes supply and installation (retrofitting) of integrated Hybrid Solar Street lighting fittings of 300W Zolar Powered lights luminous flux ranging from 7,500lm to 17,500lm ongoing Streets and Expressways with necessary accessories.

There will also be supply and installation of Galvanized Streetlight poles at new locations and also replace vandalised and knocked down poles.

The streetlights will have Surveillance Module and there will be a Control Room, such that any attempt to vandalise them will be captured.

Watch video below:

Keep Up to Date with the Most Important News

By pressing the Subscribe button, you confirm that you have read and are agreeing to our Privacy Policy and Terms of Use
Advertisement